Markets Served

Armstrong Wastewater Reclamation Plant Upgrade

 

Armstrong Wastewater Reclamation Plant Upgrade
Marietta, Pennsylvania

Contract: $1,650,000

Design-Build Team Members
Owner: Armstrong World Industries, Inc.
Engineer: US Filter Engineering & Construction, Inc.
Design-Build General Contractor: US Filter Engineering & Construction, Inc.

Design-Build Subcontractor: Johnston Construction Company

Key Accomplishments:

  • Acceptance of Johnston’s alternate design concept for concrete tanks in lieu of steel at a cost savings of $30,000.
  • Fabricated and painted steel piping in a job-built shelter in the winter before installation to accelerate completion.
  • Used hot water from nearby wastewater treatment plant processes using a series of hoses to keep curing concrete warm during cold weather installations.
Project Description:

Johnston combined forces with US Filter and worked the project as a design-build team providing a fixed price in the proposal stage. US Filter entered into a negotiated fixed price contract of about $4 million for the 500,000 gallon per day wastewater recycling plant. Johnston Construction had a subcontract of $1.65 million with US Filter.

The facility is a wastewater recycling plant located in Marietta, PA. It was designed and constructed to recycle process water from a ceiling tile manufacturing plant. It is designed as a zero discharge system with provision to discharge to the township sewer in an emergency.

Tankage included a 131' diameter, 20' high concrete tank divided into an equalization basin, clarifier, extended aeration tank and a water storage tank. It also included a pump & blower metal building by Parkline, modifications to the existing pumping station, various chemical feed systems and interconnecting piping. Other system installations included: Davco clarifier and coarse bubble diffusers, three 250 HP Hoffman blowers, two 9.3 HP Goulds horizontal centrifugal sludge transfer recycling pumps, two 25 HP Goulds horizontal centrifugal effluent pumps, a one HP Goulds submersible pump, and two 20 HP Nagle centrifugal equalization transfer pumps.

The project was implemented as a fast tracked project, with Johnston beginning construction at the 60% design point.

The project was completed on schedule despite a difficult winter of concrete work.