Aberdeen Area Wastewater Treatment Plant BNR Upgrade

 

Aberdeen Area Wastewater Treatment Plant BNR Upgrade
Aberdeen, Maryland

Contract: $5,918,000

Team Members
Owner: City of Aberdeen, Maryland
Engineer: Stearns and Wheler
General Contractor: Johnston Construction Company

Key Accomplishments:

  • The Owner accepted Johnston Construction Company’s recommendation to install stainless steel tanks in lieu of the specified painted carbon steel tanks.
  • Johnston Construction Company designed the filter building drain pump system which was incorporated into the project.
  • The construction project was substantially complete despite numerous contract additions initiated by the engineer and owner.
  • Johnston Construction Company successfully dewatered a large excavation for the in-ground denitrification filters that was located 100 hundred feet from the Chesapeake Bay shoreline and 10 feet below the maximum bay water surface.
Project Description:

Johnston Construction Company provided engineering, construction, and commissioning services for the $5,918,000 lump sum contract on this major BNR upgrade.

This was a major project for a 6.0 MGD BNR upgrade to the Aberdeen Area Wastewater Treatment Plant. The project included headworks distribution chamber modifications, a primary clarifier by-pass with parshall flume structure, primary clarifier modifications, lift pumping station pumps and piping replacement, existing shallow trickling filters conversion into tall aeration tanks with a fine bubble diffused aeration system, a blower building with sound attenuated blowers, instrumentation, insulated piping, a filter building with inground poured-in-place concrete denitrification filters, submersible lift pumps, ultraviolet disinfection, chemical feed system with instrumentation, sludge digester roof demolition, and yard piping.

Major equipment on the project is as follows: two 82 foot diameter 665,000 gallon stainless steel aeration tanks were field erected with walkways and stairways; the aeration equipment manufactured by Enviroquip Symbio provided process treatment for nitrification and denitrification in the aeration tanks; the aeration supply was provided via five centrifugal blowers manufactured by Roots each with 60 HP motors rated at 950 SCFM; a total of four poured-in-place concrete denitrifying sand filters were constructed; and a Trojan four bank ultraviolet disinfection system rated for a 6.0 MGD flow was constructed.

The project was started in July 2004. Final design, construction, and performance testing was completed in January 2006 to meet the Owner’s schedule and regulatory deadlines.