LocationYork, York County, Pennsylvania
MarketWastewater Treatment Plants
CONTROLLED ROOF DEMOLITION, MATERIAL REMOVAL, STRUCTURAL EXPOSURE, CONDITION ASSESSMENT, SITE PROTECTION, CLEANUP, AND RESTORATION.
Johnston Construction Company
- Johnston Construction Company performed the controlled demolition and removal of the existing roof system at Digester No. 2.
- JCC exposed the underlying digester components so the condition of the remaining structure could be inspected and assessed.
- The work was completed within an operating wastewater-treatment facility and required careful coordination with the York City Sewer Authority.
- JCC established the necessary work-area controls, access provisions, safety measures, and protective systems before beginning demolition.
- Demolition materials and construction debris were removed from the structure, handled safely, and disposed of in accordance with the project requirements.