Y&S Candies – MBR Piping And System Tie-Ins

Lancaster, Pennsylvania 17603

LocationLancaster, Pennsylvania 17603
MarketWastewater Treatment Plants

WASTEWATER PRETREATMENT SYSTEM EXPANSION, MEMBRANE BIOREACTOR PIPING, PROCESS EQUIPMENT INSTALLATION, BLOWER UPGRADES & BIOGAS FLARE PIPING.

Johnston Construction Company

  • Johnston Construction Company served as Civil Subcontractor for the wastewater pretreatment system expansion at the Y&S Candies manufacturing facility in Lancaster, Pennsylvania, under ADI Systems, Inc.'s design-build contract.
  • JCC fabricated and installed process piping and connections associated with the expanded anaerobic membrane bioreactor (AnMBR) treatment system, including wastewater influent, permeate, and associated process piping interfaces.
  • Installed a new forward-feed pump, including preparation and placement of the concrete pump foundation, equipment setting, alignment, and associated electrical connections to the existing motor control center.
  • Coordinated installation of process valves, instrumentation, pneumatic air lines, electrical conduit, control wiring, and communication connections required for operation of the expanded wastewater treatment system.
  • The project included modifications to existing treatment equipment, including replacement of a flow-control valve and relocation of an existing 4-inch flowmeter at Continuous Stirred Tank Reactor (CSTR) Digester No. 3, with associated connections to the existing programmable logic controller (PLC).