LocationAnnapolis, Maryland
MarketOther Specialty Projects
TERTIARY BOOSTER PUMP LOOP, CHILLED WATER PIPING, VFDs, CONTROLS AND SYSTEM INTEGRATION.
Johnston Construction Company
- Performed comprehensive mechanical, electrical and controls construction for upgrades to the U.S. Naval Academy campus chilled-water distribution system.
- Added a new booster pump loop to the existing campus chilled-water system to improve chilled-water flow to major Academy buildings.
- Supported chilled-water service to Rickover Hall, Alumni Hall and Nimitz Hall while operating in conjunction with the Science Chilled Water Plant.
- Procured and installed three new 200 HP chilled-water pumps and motors for the booster-pump system.
- Installed the three 200 HP pump assemblies within the G49 Chiller Plant.