Sussex Shores WTP No. 1 Pretreatment Improvements

Bethany Beach, Sussex County, Delaware

LocationBethany Beach, Sussex County, Delaware
MarketWater Treatment Plants

AERATOR SYSTEM, IN-LINE MIXING, HIGH-SERVICE PUMP, PROCESS PIPING & CONTROLS UPGRADE.

Johnston Construction Company

  • Johnston Construction Company served as Prime Contractor for the pretreatment improvements at Sussex Shores Water Company’s Water Treatment Plant No. 1 in Bethany Beach, Delaware. The executed contract identifies Sussex Shores Water Company as Owner and Hatch Mott MacDonald as Engineer.
  • Managed a multi-discipline treatment-plant upgrade encompassing demolition, process piping, high-service pumping, concrete, mechanical equipment, electrical, instrumentation and controls, while coordinating construction within an operating water-treatment facility.
  • Removed the existing flocculation tank and hydropneumatic tank, including associated equipment, concrete bases and supports, and repaired affected building wall openings and surrounding areas.
  • JCC coordinated the temporary removal and storage of the existing slat-tray aerators to permit installation of the new aerator discharge piping and pretreatment equipment.
  • Replaced the aerator inlet piping and installed the new aerator discharge piping system, including fittings, supports, insulation and heat tracing.