Markets Served / Project Experience

Staunton Crossing Water and Sewer Extensions

Staunton, Virginia

LocationStaunton, Virginia
MarketPump Stations

PUMP STATION AND WET WELL CONSTRUCTION FOR WATER AND SEWER EXTENSION PROJECT.

Johnston Construction Company

  • Constructed a new wastewater pump station and wet well as part of the Staunton Crossing Water and Sewer Extensions project.
  • Furnished and installed the pump station building, 12-foot diameter precast wet well, pump package, electrical and instrumentation systems, process piping, HVAC, plumbing, and related concrete improvements.
  • Supported water and sewer utility extensions serving the Staunton Crossing development, including a new triplex suction-lift wastewater pump station in a precast concrete building.
  • The project included approximately 1,500 linear feet of 15-inch sanitary sewer, 5,560 linear feet of 12-inch sewer force main, approximately 386 linear feet of 8-inch water main, 175 linear feet of 12-inch water main, 5,505 linear feet of 16-inch water main, approximately 4,900 linear feet of 18-inch and smaller gravity sewer, and approximately 580 linear feet of 12-inch sewer force main. The project also included necessary structures and appurtenances to serve the Staunton Crossing development.
  • JCC’s scope included providing labor, equipment, materials, and services to complete the Staunton Pump Station and Wet Well work in accordance with the project plans, specifications, engineer revisions, and JCC’s proposal. The pump station work included electrical and instrumentation systems, generator, automatic transfer switch, motor drives, panelboards, control panels, and conduit and wiring for the pump station.

Concrete Services Division

  • Performed concrete forming, placement, finishing, and curing for the new Staunton BPS wastewater pump station.
  • Coordinated concrete placement, testing, pumping, rental equipment, winter protection, and jobsite concrete support with Johnston Construction Company.
  • The overall project included approximately 1,500 linear feet of 15-inch sanitary sewer, 5,560 linear feet of 12-inch sewer force main, approximately 386 linear feet of 8-inch water main, 175 linear feet of 12-inch water main, 5,505 linear feet of 16-inch water main, approximately 4,900 linear feet of 18-inch and smaller gravity sewer, and approximately 580 linear feet of 12-inch sewer force main. The project also included necessary structures and appurtenances to serve the Staunton Crossing development.
  • CSD’s scope included furnishing labor, materials, and tools necessary for forming and concrete placement for the Staunton BPS in accordance with the project contract documents, selected process drawings, standard and supplementary conditions, submittal requirements, temporary facilities and environmental protection requirements, earthwork, concrete anchors, cast-in-place concrete, grout, and the CSD control estimate.
  • The concrete work included forming, placing, finishing, and curing associated with the pump station building slab, generator pad, exterior stoops, and grout infill. CSD’s scope included mobilization and demobilization of concrete equipment, tools, and supplies; rental of form material; purchase of form lumber; installation and stripping of forms; concrete placement labor; concrete finishing labor and supplies; curing labor and supplies; and concrete accessory labor.

B & R Electrical Contractors

  • Performed electrical construction for a new wastewater pump station serving the Staunton Crossing Water and Sewer Extensions project.
  • Furnished and installed conduit, wire, connections, electrical equipment, lighting, junction boxes, service rack, equipment rack, ductbank, grounding, testing, startup, and record drawing support.
  • Supported the pump station electrical systems required for operation of the new triplex suction-lift wastewater pump station in a precast concrete building.
  • The overall project included approximately 1,500 linear feet of 15-inch sanitary sewer, 5,560 linear feet of 12-inch sewer force main, approximately 386 linear feet of 8-inch water main, 175 linear feet of 12-inch water main, 5,505 linear feet of 16-inch water main, approximately 4,900 linear feet of 18-inch and smaller gravity sewer, and approximately 580 linear feet of 12-inch sewer force main. The project also included necessary structures and appurtenances to serve the Staunton Crossing development.
  • BRE’s scope included furnishing labor, materials, and tools necessary for the electrical work for the Staunton BPS in accordance with the project contract documents, City of Staunton Project No. D00324, Division 26 electrical specifications, Addendum No. 1, electrical drawings, BRE proposal, and BRE control estimate.