LocationStafford, Stafford County, Virginia
MarketPump Stations
PUMP STATION REPLACEMENT, WET WELL, FORCE MAIN, PIG LAUNCHING VAULT, STANDBY POWER AND CONTROLS.
Johnston Construction Company
- Served as Prime Contractor for the complete replacement and upgrade of the Stafford Oaks Sewage Pump Station.
- Constructed a replacement wastewater pumping facility with an ultimate build-out safe capacity of 450 gallons per minute (gpm).
- Demolished the existing sewage pump station wet well and existing pumping equipment.
- Installed a new wet well and prefabricated horizontal self-priming centrifugal pump station.
- Integrated two self-priming, non-clog sewage pumps into the new pumping system.