Sixth Street Water Treatment Plant Clearwell No. 2 Improvements

Harrisburg, Pennsylvania

LocationHarrisburg, Pennsylvania
MarketWater Storage and Tanks

CLEARWELL CLEANING, SEDIMENT AND WASTE REMOVAL, INTERIOR CONCRETE REPAIRS, 36-INCH STAINLESS-STEEL INLET PIPING, PIPE SUPPORTS, TANK DISINFECTION, AND WATER-SYSTEM RESTORATION.

Johnston Construction Company

  • Johnston Construction Company performed the Sixth Street Water Treatment Plant Clearwell No. 2 Improvements project for Veolia Water Pennsylvania, Inc.
  • The project included cleaning and rehabilitation work within a 700,000-gallon partially buried concrete clearwell used for finished-water storage at the Sixth Street Water Treatment Plant.
  • JCC removed accumulated lime deposits, sediment, staining, and other waste materials from the clearwell and transported the removed material to an approved disposal facility.
  • The work included minor repairs to the clearwell’s interior concrete walls and exposed aggregate areas identified during the previous tank inspection.
  • JCC furnished and installed a new 36-inch stainless-steel vertical inlet-piping assembly and associated fittings and supports within the clearwell.