LocationMilford, Sussex County, Delaware
MarketWater Storage and Tanks
CIVIL SITEWORK, AUGER-CAST PILE FOUNDATION, STRUCTURAL CONCRETE, WATERMAINS, PIPING, ELECTRICAL & TANK-SITE INFRASTRUCTURE.
Johnston Construction Company
- Johnston Construction Company served as Civil Subcontractor to CB&I for construction of the new 750,000-gallon S.E. Milford Elevated Storage Tank in Milford, Delaware. The overall project included the elevated tank, pile foundation, water piping, electrical systems, coatings and associated site improvements.
- Performed a broad civil, mechanical and electrical support package for the tank project, integrating foundation construction, site development, piping, electrical work and restoration under a single subcontract.
- Completed site clearing, grading and general site development required to prepare the elevated-tank site for foundation and infrastructure construction.
- Performed construction surveying and layout to establish the tank foundation, site improvements, piping and associated project features.
- Removed and disposed of existing site debris encountered within the project area as part of site preparation.
Concrete Services Division
- Concrete Services Division, LLC served as Trade Subcontractor to Johnston Construction Company for the concrete portion of the foundation supporting the new 750,000-gallon S.E. Milford Elevated Storage Tank.
- Furnished the labor, materials, tools and concrete-construction resources required for forming and concrete placement of the elevated-tank foundation in accordance with the project drawings, specifications and CB&I foundation requirements.
- Mobilized and demobilized concrete equipment, tools and supplies required to execute the foundation-concrete package.
- Furnished form materials and lumber and performed installation and stripping of concrete forms for the tank-foundation construction.
- The subcontract billing schedule identified approximately 913 square feet of foundation formwork, including footing, slab-on-grade and substantial curved-wall forming.
Electrical Services Division
- Electrical Services Division, LLC served as Trade Subcontractor to Johnston Construction Company for the electrical portion of the new 750,000-gallon S.E. Milford Elevated Storage Tank in Milford, Delaware.
- Furnished the labor, materials and tools necessary for the electrical construction package associated with the elevated water-storage facility.
- Installed extensive electrical conduit, wire and equipment connections required throughout the tank-site electrical system.
- Furnished and installed lighting, switches and receptacles serving the elevated-storage-tank facility.
- Installed the project's LP panelboard and surge-protection unit, providing distribution and protection for the tank-site electrical system.