LocationMartinsburg, Berkeley County, West Virginia
MarketWater Storage and Tanks
CIVIL, MECHANICAL, ELECTRICAL, AND INSTRUMENTATION CONSTRUCTION FOR TWO NEW 2,000,000-GALLON COMPOSITE ELEVATED WATER STORAGE TANKS.
Johnston Construction Company
- Johnston Construction Company performed civil, mechanical, electrical, and instrumentation work for the Industrial Zone and Ridge Road Water Storage Tanks project in Berkeley County, West Virginia.
- The project included construction of two new 2,000,000-gallon composite elevated water storage tanks, consisting of concrete pedestals and steel cylindrical bowls.
- JCC’s scope supported both the Industrial Zone tank near Development Drive and the Ridge Road tank along Ridge Road South, including site work, waterline work, mechanical piping, valves, electrical and instrumentation systems, testing, documentation, and closeout support.
- Major work included site preparation, erosion and sediment controls, excavation, dewatering, watermain installation, valve and appurtenance installation, stormwater management improvements, foundation and subgrade coordination, electrical and instrumentation installation, lighting, grounding, testing, record drawings, O&M manuals, and final site grading and restoration.
- The Industrial Zone tank included approximately 500 linear feet of on-site watermain, 16-inch to 20-inch nominal diameter, stormwater management piping, infiltration trench, check valves, gate valves, butterfly valves, altitude valves, and related appurtenances.
Concrete Services Division
- Concrete Services Division, LLC performed concrete forming, placement, finishing, curing, and accessory work for the Ridge Road 2MGAL Elevated Water Storage Tank in Martinsburg, West Virginia.
- The project included construction of a new 2,000,000-gallon composite elevated water storage tank as part of the Industrial Zone and Ridge Road Water Storage Tanks project for Berkeley County Public Service Water District.
- CSD’s scope included concrete work for the tank foundation, including slab-on-grade forming, curved wall forming, straight wall forming, bulkhead forming, slab-on-grade placement, wall placement, grout placement, float and screed work, trowel finishing, point and patch work, curing, concrete accessories, and pipe pads.
- Major work included mobilization and demobilization of concrete equipment, tools, and supplies; rental of form material; purchase of form lumber; installation and stripping of forms; concrete placement labor; concrete finishing labor and supplies; concrete curing labor and supplies; and concrete accessory material and labor.
- The concrete work required coordination with Johnston Construction Company, CB&I Storage Tank Solutions, Berkeley County Public Service Water District, Dewberry Engineers Inc., concrete suppliers, testing agencies, concrete pumping services, equipment providers, and project stakeholders.
Electrical Services Division
- Electrical Services Division, LLC performed electrical construction work for the Ridge Road 2MGAL Elevated Water Storage Tank in Martinsburg, West Virginia.
- The project included construction of a new 2,000,000-gallon composite elevated water storage tank as part of the Industrial Zone and Ridge Road Water Storage Tanks project for Berkeley County Public Service Water District.
- ESD’s scope included conduit, wire, connections, electrical ductbank excavation, concrete encasement and rebar for electrical service ductbank, lighting, panel gear, power monitoring, surge protection, disconnects, phase monitor, heat tracing, lightning protection, testing, startup, and electrical closeout support.
- Major electrical work included installation of lighting fixtures, conduit, boxes and devices, wire, switchgear, heat trace, lightning protection, electrical service ductbank, inspection, testing, startup, and two sets of six 6-inch conduits through the foundation.
- The work required coordination with Johnston Construction Company, CB&I Storage Tank Solutions, Berkeley County Public Service Water District, Dewberry Engineers Inc., utility providers, electrical suppliers, testing services, tank manufacturer, and project stakeholders.