LocationDenver, Lancaster County, Pennsylvania
MarketPump Stations
RAW SEWAGE PUMP REMOVAL AND REPLACEMENT, PROCESS PIPING, VALVES, BYPASS PUMPING, CONCRETE-BASE MODIFICATIONS, LEVEL-CONTROL STILLING WELLS, TESTING, STARTUP, AND OPERATOR TRAINING.
Johnston Construction Company
- Johnston Construction Company completed the general and mechanical work for the Raw Sewage Pump Replacement Project at the Adamstown Borough Wastewater Treatment Plant.
- The project included removal of three existing raw sewage pumps and installation of three new Owner-furnished Cornell Model 6NHTA, 20-horsepower raw sewage pumps.
- JCC completed the associated process-piping, fittings, valve work, concrete pump-base modifications, and installation of primary and secondary level-control stilling wells.
- The work required carefully sequenced pump replacement to maintain operation of the influent pumping station and minimize the duration of bypass pumping.
- JCC provided a primary bypass pumping system capable of handling 1,200 gallons per minute at 45 feet of total dynamic head, together with an automatically available equal-capacity standby pump.