Markets Served / Project Experience

Phoenix Resources Landfill – Leachate Concentrator Installation

Wellsboro, Pennsylvania 16901

LocationWellsboro, Pennsylvania 16901
MarketIndustrial and Environmental

LEACHATE CONCENTRATOR SYSTEM INSTALLATION, CONCRETE CONTAINMENT STRUCTURES, PROCESS PIPING, PUMP INSTALLATION, ELECTRICAL WORK & MECHANICAL EQUIPMENT INTEGRATION.

Johnston Construction Company

  • Johnston Construction Company served as Prime Contractor for the leachate concentrator installation at Waste Management's Phoenix Resources Landfill in Wellsboro, Pennsylvania, providing comprehensive civil, mechanical, piping, and electrical construction services.
  • JCC coordinated preparation of the installation area and integration of owner-furnished leachate concentrator equipment, including the concentrator skid, flare skid, duct support structure, and cone-bottom concentrate tank.
  • Furnished and installed new reinforced concrete equipment pads and containment walls, including modifications to the existing concrete load-out area to accommodate additional process equipment and drainage systems.
  • Installed underground dual-contained high-density polyethylene (HDPE) drain piping, consisting of a 3-inch carrier pipe within a 6-inch containment pipe, extending from the new containment area to an existing manhole.
  • JCC furnished and installed new leachate infeed and load-out pumping equipment, including associated valves, fittings, pressure connections, and mechanical accessories.