LocationSalisbury, Wicomico County, Maryland
MarketWater Treatment Plants
FLUORIDE DRAIN PIPING, SECONDARY CONTAINMENT PIPING, CHEMICAL-FEED TUBING, INSPECTION-VAULT MODIFICATIONS, LEAK-DETECTION CONNECTIONS, FLUORIDE-TANK AND PUMP CONNECTIONS, DEMOLITION, EXCAVATION, CONCRETE, TESTING, AND RESTORATION.
Johnston Construction Company
- Johnston Construction Company completed improvements to the fluoride chemical-feed and drain system at the City of Salisbury’s Park Water Plant.
- JCC demolished existing fluoride-system piping and components necessary to accommodate the new installation.
- The company installed new fluoride drain piping with secondary containment to improve chemical containment and operating safety.
- JCC installed new chemical-feed tubing and completed the required connections to the existing fluoride-storage tank and chemical-feed pump.
- The work included modifications to the existing inspection vault to accommodate new piping, tubing, supports, penetrations, and leak-detection components.