LocationOcean City, Maryland 21842
MarketWastewater Treatment Plants
HEADWORKS SLUICE GATE OPERATOR SUPPORT REPAIRS, ROTORK ADJUSTMENT & MIXER BASE REPAIR.
Johnston Construction Company
- Johnston Construction Company served as Prime Contractor for repair work at the Ocean City Wastewater Treatment Plant headworks facility.
- Removed and replaced two failed sluice-gate operator support brackets associated with the existing headworks gate equipment.
- JCC coordinated a Rotork service technician to inspect and adjust gate travel after the existing gate was determined to be over-torquing during the closing cycle.
- Installed specially fabricated structural support brackets designed for loads of up to approximately 8,000 pounds.
- The replacement brackets incorporated a ¾-inch A36 steel top plate and ½-inch gussets, with the assemblies bolted to the existing structure.