LocationMilford, Delaware
MarketWater Storage and Tanks
CONCRETE CONSTRUCTION FOR NEW 300,000-GALLON ELEVATED WATER STORAGE TANK FOUNDATION.
Concrete Services Division
- Performed concrete forming, placement, finishing, and curing for the tank foundation of a new 300,000-gallon elevated water storage tank.
- Supported construction of the elevated water storage tank foundation through footing, slab-on-grade, curved wall, pipe pad, dowel, accessory, and curing work.
- Coordinated concrete, testing lab services, concrete pumping services, rental equipment, and jobsite concrete support with Johnston Construction Company.
- Concrete Services Division, LLC performed the concrete construction scope for the Milford Corporate Center Elevated Water Storage Tank project in Milford, Delaware. The overall project included construction of a new single-pedestal 300,000-gallon elevated water storage tank for the City of Milford at the Milford Corporate Center, located at the intersection of Milford-Harrington Highway and Canterbury Road in Kent County, Delaware.
- CSD’s scope included furnishing labor, materials, and tools necessary for forming and concrete placement of the tank foundation in accordance with the project contract documents, selected project drawings, general and special conditions, submittal, quality, execution, construction waste management, cast-in-place concrete, earthwork, and elevated water tank specification sections, along with the CSD control estimate, CB&I project specifications, and CB&I foundation drawings.
Electrical Services Division
- Performed electrical construction for a new 300,000-gallon single-pedestal elevated water storage tank serving the Milford Corporate Center area.
- Installed conduit, wiring, lighting, electrical gear, grounding, lightning protection components, handholes, and direct-burial ductbank infrastructure to support tank operation and project completion.
- Coordinated electrical submittals, O&M review, testing services, rental equipment, startup support, and as-built/record drawings for project closeout.
- Electrical Services Division performed the electrical construction scope for the Milford Corporate Center Elevated Water Storage Tank project in Milford, Delaware. The overall project included construction of a new single-pedestal 300,000-gallon elevated water storage tank for the City of Milford, including internal equipment, instrumentation, heating, ventilation, lighting, and wiring associated with the tank improvements.
- The electrical work also included installation of the lightning protection ground ring around the base of the tank, welded tab connections, direct-burial ductbanks, electrical service and light pole ductbank excavation, an electrical handhole, and wire, panel, and conduit labeling. ESD also included six-inch conduits for future antenna cable provisions as part of the project electrical infrastructure.