LocationMiddletown, Frederick County, Maryland
MarketPump Stations
TEMPORARY BYPASS PUMPING, BOOSTER PUMP MOTOR REPLACEMENT, VARIABLE FREQUENCY DRIVES, PROCESS-PIPING MODIFICATIONS, DEMOLITION, ELECTRICAL AND INSTRUMENTATION UPGRADES, DOOR REPLACEMENT, COATINGS, TESTING, AND STARTUP.
Johnston Construction Company
- Johnston Construction Company completed major upgrades to the Town of Middletown’s existing water booster station.
- JCC maintained uninterrupted water-system pressure and pumping capacity through a temporary bypass-pumping system operated during the majority of construction.
- The project included replacement of the existing motors on two vertical split-case booster pumps with new inverter-duty motors.
- JCC installed two Owner-furnished 100-horsepower variable frequency drives and completed the associated mounting, conduit, power wiring, control wiring, and equipment connections.
- The existing packaged booster-skid system, jockey pumps, steel piping, valves, and hydropneumatic tanks were demolished and removed.
Electrical Services Division
- Electrical Services Division, LLC performed the electrical construction work supporting the Town of Middletown Water Booster Station Improvements project.
- ESD furnished and installed conduit, wire, boxes, devices, connections, switchgear components, and supporting electrical materials throughout the booster station.
- The work included installation of a new lighting panel and equipment rack serving the upgraded station systems.
- ESD completed electrical demolition associated with removal and replacement of the existing booster-station equipment.
- Temporary electrical service and power provisions supported ongoing facility operations during construction.