LocationLemoyne, Cumberland County, Pennsylvania
MarketPump Stations
WET-WELL REPLACEMENT, SUCTION-LIFT PUMP-STATION INSTALLATION, TEMPORARY BYPASS PUMPING, PROCESS PIPING, FORCE-MAIN CONNECTIONS, STRUCTURAL MODIFICATIONS, SITE WORK, STARTUP, AND RESTORATION.
Johnston Construction Company
- Johnston Construction Company served as the General Construction Contractor for the replacement of the Clark Street and Walton Street wastewater pump stations.
- JCC removed the existing pneumatic-ejector pumping equipment, internal piping, guide rails, floats, and related appurtenances from both pump-station structures.
- The company installed new wet wells within the existing Clark Street and Walton Street ejector structures under the two accepted deductive alternates.
- JCC installed two Owner-furnished Gorman-Rupp suction-lift packaged pump stations with ReliaSource aboveground enclosures.
- The work included structural modifications to the existing pump-station structures, new pipe penetrations, concrete collars, stone placement, backfill, and restoration.