Lancaster City WWTP – South Train Flow Diversion Weir Gate Repair

Lancaster, Pennsylvania 17603

LocationLancaster, Pennsylvania 17603
MarketWastewater Treatment Plants

WEIR GATE REMOVAL, REPLACEMENT COMPONENT INSTALLATION, GATE REASSEMBLY & OPERATIONAL TESTING.

Johnston Construction Company

  • Johnston Construction Company served as Prime Contractor for repair of an existing flow-diversion weir gate at the City of Lancaster Wastewater Treatment Plant.
  • Repaired the existing Fontaine Series 40 weir gate associated with the plant's South Train Flow Diversion system.
  • JCC removed the existing damaged weir gate assembly to provide access for the required repair work.
  • Installed the required replacement components on the existing gate and prepared the assembly for reinstallation.
  • Reinstalled the repaired gate assembly within the existing South Train flow-diversion structure.