LocationLancaster, Pennsylvania 17603
MarketWastewater Treatment Plants
WEIR GATE REMOVAL, REPLACEMENT COMPONENT INSTALLATION, GATE REASSEMBLY & OPERATIONAL TESTING.
Johnston Construction Company
- Johnston Construction Company served as Prime Contractor for repair of an existing flow-diversion weir gate at the City of Lancaster Wastewater Treatment Plant.
- Repaired the existing Fontaine Series 40 weir gate associated with the plant's South Train Flow Diversion system.
- JCC removed the existing damaged weir gate assembly to provide access for the required repair work.
- Installed the required replacement components on the existing gate and prepared the assembly for reinstallation.
- Reinstalled the repaired gate assembly within the existing South Train flow-diversion structure.