LocationDickinson Township, Cumberland County, Pennsylvania
MarketWater Storage and Tanks
WATER-SUPPLY AND DISTRIBUTION PIPING REPLACEMENT, TEMPORARY WATER-SYSTEM CONNECTIONS, BLOW-OFF HYDRANTS, VENT PIPING, PIPE INSULATION, HEAT TRACING, PROPANE HEATER, GAS PIPING, TESTING, AND DISINFECTION.
Johnston Construction Company
- Johnston Construction Company performed the plumbing construction associated with rehabilitation of the historic water tower at Kings Gap Environmental Education Center.
- JCC removed and replaced the existing water-supply and distribution piping inside the tower from the valve pit to the connection with the new water-storage tank.
- The work included new domestic-water piping, fittings, valves, supports, insulation, and connections required to place the rehabilitated tower and replacement water tank into service.
- JCC furnished and installed the piping and connections required between the temporary water-storage vessel and the existing underground water-supply and distribution system.
- Temporary-system work was coordinated to maintain water service to the Kings Gap facilities while the existing water tower and tank systems were being rehabilitated.