Markets Served / Project Experience

Kent County Regional Resource Recovery Facility – Blower Optimization & Standby Power Improvements

Milford, Kent County, Delaware

LocationMilford, Kent County, Delaware
MarketWastewater Treatment Plants

BLOWER OPTIMIZATION EQUIPMENT INSTALLATION.

Johnston Construction Company

  • Johnston Construction Company installed two Owner-furnished high-speed turbo blowers at the Kent County Regional Resource Recovery Facility.
  • JCC removed two existing multistage blowers and completed the structural, mechanical, electrical, and instrumentation modifications needed for the new equipment.
  • The project included new low-pressure process-air piping, butterfly valves, supports, insulation, identification, and connections to the existing aeration headers.
  • JCC furnished and operated a complete temporary backup blower system to maintain uninterrupted aeration while the existing equipment was taken out of service.
  • Construction was carefully sequenced so the wastewater-treatment plant remained operational and continued meeting its required discharge limits.

Concrete Services Division

  • Concrete Services Division, LLC constructed the reinforced-concrete foundations and equipment pads supporting the Kent County Regional Resource Recovery Facility blower-optimization improvements.
  • CSD completed concrete work for the new high-speed turbo blowers and associated electrical transformers.
  • The work included slab-on-grade formwork, reinforcing-steel placement, dowels, concrete accessories, concrete placement, finishing, and curing.
  • CSD’s scope was later expanded to include the foundations and structural concrete required for the facility’s standby-power system.
  • The additional work included the packaged-generator foundation, equipment pad, containment walls and curbs, switchgear-building slab, door landings, platform bases, and ground-well concrete collars.

B & R Electrical Contractors

  • B & R Electrical Contractors, Inc. performed the major electrical construction supporting installation of two high-speed turbo blowers at the Kent County Regional Resource Recovery Facility.
  • BRE completed electrical demolition associated with the existing blower starters, transformers, motor-control equipment, fuses, and related electrical systems.
  • The project included new transformers, switchgear, reduced-voltage solid-state motor controllers, conduits, conductors, boxes, devices, grounding, and equipment connections.
  • BRE installed extensive power and control raceways and wiring serving the new blower equipment and its associated control systems.
  • The company coordinated third-party electrical testing, including power-system studies, equipment testing, infrared inspections, grounding tests, and commissioning activities.

Additional project details

  • JCC replaced two existing multistage blowers with two Owner-furnished high-speed turbo blowers at the active Kent County Regional Resource Recovery Facility, 139 Milford Neck Road.
  • The installation combined equipment removal, structural modifications, process-air piping, electrical upgrades, and controls integration while maintaining continuous wastewater treatment.

Browse all project experience