LocationJackson Township, Butler County, Pennsylvania
MarketWater Storage and Tanks
CIVIL, FOUNDATION, MECHANICAL, ELECTRICAL, INSTRUMENTATION, SITE DEVELOPMENT, WATER-MAIN, DRAINAGE, AND RESTORATION WORK FOR A NEW 750,000-GALLON ELEVATED WATER-STORAGE TANK.
Johnston Construction Company
- Johnston Construction Company performed the civil, foundation, mechanical, electrical, and instrumentation construction supporting a new 750,000-gallon elevated water-storage tank.
- The company constructed the reinforced-concrete tank foundation and coordinated anchor bolts, embedded components, penetrations, and structural interfaces with CB&I’s elevated-tank design.
- JCC installed the Owner-furnished 16-inch and 8-inch underground ductile-iron water mains, valves, fittings, restraints, polywrap, and associated appurtenances.
- The work included PVC and HDPE drainage piping, manholes, inlets, drainage basins, and the stormwater-management system serving the tank site.
- JCC constructed the driveway, fencing, gate, and related access and security improvements.
Concrete Services Division
- Concrete Services Division, LLC performed the structural and site-concrete construction supporting the new 750,000-gallon Jackson Township Elevated Water Storage Tank.
- The scope included a concrete curb, equipment pad, fire-hydrant pad, level-spreader concrete berm, and four pipe-support pads.
- CSD installed footing, slab-on-grade, curved-wall, and straight-wall formwork and stripped the forms after the concrete achieved adequate strength.
- The company coordinated placement of approximately 192 cubic yards of concrete purchased by Johnston Construction Company.
- CSD placed approximately 15.75 tons of reinforcing steel and installed 20 dowels within the assigned concrete work.
Electrical Services Division
- Electrical Services Division performed the electrical construction supporting Pennsylvania-American Water Company’s new 750,000-gallon Jackson Township Elevated Water Storage Tank.
- ESD furnished and installed conduit, conductors, connections, electrical boxes, switches, receptacles, and supporting devices throughout the tank facility.
- The work included the electrical service, panelboard, switchgear, and surge-protection equipment serving the tank’s electrical systems.
- ESD installed lighting systems supporting safe operation, inspection, access, and maintenance within and around the elevated tank.
- The company furnished and installed a lightning-protection system coordinated with the elevated steel tank and site grounding provisions.