- Johnston Construction Company served as Prime Contractor for the certification of an existing 2,000-gallon aboveground diesel storage tank at the Huntingdon Wastewater Treatment Plant in Huntingdon, Pennsylvania.
- Undertook a specialized tank installation certification assignment associated with equipment previously installed during the wastewater treatment plant's 2010 facility upgrade.
- JCC's certification work concerned a 2,000-gallon, double-wall, unprotected steel aboveground storage tank used for diesel fuel storage at the municipal wastewater treatment facility.
- Completed the tank certification assignment under a time-and-material arrangement with Huntingdon Borough, supporting the facility's storage tank documentation requirements.
- The existing aboveground storage tank was identified as a 2,000-gallon, double-wall steel tank designed for diesel fuel storage. The double-wall configuration provides an additional containment boundary around the primary storage vessel. Johnston Construction Company's assignment concerned the installation certification of this existing tank within the operating wastewater treatment facility.