LocationHarrington, Kent County, Delaware
MarketWater Storage and Tanks
NEW MUNICIPAL WELL, SUBMERSIBLE PUMP, CMU WELL HOUSE, WATER-TREATMENT FACILITY, ELEVATED WATER STORAGE TANK, PROCESS PIPING, ELECTRICAL SYSTEMS, CONTROLS, PAVING, AND SITE RESTORATION.
Johnston Construction Company
- Johnston Construction Company completed the 500,000-Gallon Elevated Water Storage Tank and Well House project for the City of Harrington.
- The project included construction of a new municipal well equipped with a submersible pump and motor.
- JCC constructed a new concrete-masonry-unit well house and water-treatment facility to support the City’s expanded water-supply infrastructure.
- The work included construction of a new 500,000-gallon spheroid welded-steel elevated water storage tank and the appurtenances required for a complete operating system.
- JCC installed the associated process piping, valves, fittings, supports, water-service connections, electrical systems, controls, instrumentation, and facility equipment.
Concrete Services Division
- Concrete Services Division, LLC completed the concrete work associated with the City of Harrington’s 500,000-Gallon Elevated Water Storage Tank and Well House project.
- CSD furnished the labor, form materials, tools, equipment, finishing supplies, curing materials, and concrete accessories required for its assigned work.
- The project included concrete construction for the elevated water-storage-tank foundation, well-house foundation, generator foundation, floor slabs, splash pads, pipe pads, door pads, sump pits, and associated structural features.
- CSD completed footing, slab-on-grade, curved-wall, and column formwork required for the project’s concrete foundations and structures.
- The work included concrete placement, floating, screeding, machine troweling, pointing, patching, curing, vapor-barrier installation, joint work, perimeter insulation, and pipe-pad construction.
Electrical Services Division
- Electrical Services Division completed the electrical work associated with the City of Harrington’s 500,000-Gallon Elevated Water Storage Tank and Well House project.
- ESD furnished and installed conduit, wiring, electrical connections, lighting, switches, receptacles, electrical service equipment, switchgear, panelboards, and surge-protection equipment.
- The electrical work supported the new elevated water-storage tank, municipal well, well house, water-treatment facility, pumping equipment, and associated site improvements.
- ESD installed underground electrical ductbanks and raceways serving the electrical service and the connections between the elevated tank and well house.
- The work included four grounding rods at the base of the elevated tank for lightning-protection grounding.
Additional project details
- The City of Harrington expanded its water supply and storage with a new municipal well, submersible pump, CMU well house and treatment facility, and a 500,000-gallon elevated storage tank.
- JCC delivered the associated building, process, utility, electrical, and site work.