LocationHagerstown, Washington County, Maryland
MarketWastewater Treatment Plants
ELECTRICAL POWER, INSTRUMENTATION, SWITCHGEAR, DUCTBANK, FIBER-OPTIC AND PROCESS EQUIPMENT CONNECTIONS.
Electrical Services Division
- Performed the major electrical construction package associated with the Phase 2 Dryer Rehabilitation at the City of Hagerstown Wastewater Treatment Plant.
- Furnished electrical labor, materials, tools, equipment and supervision required for the contracted electrical work.
- Installed power conduit, conductors and electrical connections serving the rehabilitated wastewater-treatment and sludge-processing systems.
- Installed instrumentation conduit, wiring and electrical connections supporting plant process monitoring and controls.
- Installed electrical raceways for power and control systems throughout the affected process areas.