Markets Served / Project Experience

Gorman Avenue Water Treatment Plant Ferric Chloride System Addition

Ocean City, Worcester County, Maryland

LocationOcean City, Worcester County, Maryland
MarketWater Treatment Plants

BULK CHEMICAL STORAGE FACILITY, FRP STORAGE TANKS, DOUBLE-WALL DAY TANK, METERING PUMPS, TRANSFER PUMP, CHEMICAL PIPING, SECONDARY CONTAINMENT, STRUCTURAL CONCRETE, FRP ACCESS SYSTEMS, ELECTRICAL SYSTEMS, INSTRUMENTATION, SCADA INTEGRATION.

Johnston Construction Company

  • The project included construction of a new bulk ferric chloride storage facility and installation of a complete chemical storage, transfer, metering, and feed system.
  • JCC furnished and installed three fiberglass-reinforced-plastic bulk storage tanks designed for 40-percent ferric chloride service.
  • The work included a double-wall, high-density cross-linked polyethylene day tank with integral secondary containment.
  • JCC installed three ferric chloride metering pumps, a geared chemical transfer pump, pressure sensors, pressure gauges, pulsation dampeners, calibration equipment, pressure-relief valves, and chemical-resistant flexible connections.
  • The project included reinforced-concrete foundations, containment areas, tank pads, structural steel, FRP grating, FRP stairs, handrails, coatings, piping supports, and chemical-system access improvements.

Concrete Services Division

  • CSD constructed the concrete foundations and containment structures required for the new ferric chloride bulk-storage and chemical-feed facility.
  • The work included the ferric chloride bulk-storage tank pad, day-tank slab, facility foundation with trench, chemical-containment walls, equipment pedestal, sump pit, and concrete steps.
  • The forming work included approximately 28 square feet of footing forms, 567 square feet of slab-on-grade forms, 973 square feet of straight-wall forms, 103 square feet of column forms, and 35 square feet of special formwork.
  • CSD placed approximately 79 cubic yards of slab-on-grade concrete, 9 cubic yards of wall concrete, 2 cubic yards of column concrete, and the additional footing and fill concrete required by the project.
  • The finishing work included approximately 1,331 square feet of floating and screeding and more than 1,100 square feet of pointing and patching.

B & R Electrical Contractors

  • BRE’s work included electrical demolition, conduit, conductors, boxes, devices, panelboards, transformer installation, equipment connections, grounding, underground electrical ductbank, inspection, testing, startup, and project closeout.
  • BRE installed the power and control infrastructure required for the new bulk ferric chloride storage and chemical-feed facility.
  • The work included electrical connections serving three bulk ferric chloride storage tanks, a double-wall day tank, three chemical metering pumps, a ferric chloride transfer pump, control panels, tank-level instruments, alarms, and associated process equipment.
  • BRE furnished and installed electrical Panelboards PBH and PBR and a new 15 kVA transformer.
  • The underground electrical work included excavation, reinforced-concrete ductbank construction, conduit installation, and coordination with the chemical-containment structure, foundations, process piping, and existing plant utilities.

Browse all project experience