LocationWhite Plains, Charles County, Maryland
MarketWater Storage and Tanks
DESIGN, PERMITTING, AND CONSTRUCTION OF A NEW TWO-MILLION-GALLON COMPOSITE ELEVATED WATER STORAGE TANK WITH INTEGRATED OFFICES AND STORAGE, A LINE MAINTENANCE BUILDING, SITE UTILITIES, WATER AND SEWER CONNECTIONS, ELECTRICAL SERVICE.
Johnston Construction Company
- Johnston Construction Company served as the prime contractor for the Gleneagles Water Tower Construction project for Charles County Government.
- The project included design, permitting, and construction of a new two-million-gallon composite elevated water storage tank on a previously undeveloped site.
- Constructed the reinforced-concrete support structure, tank foundation, steel water-storage bowl, access systems, piping, coatings, and operating appurtenances required for the complete elevated storage facility.
- Constructed a separate line maintenance building to support Charles County water-utility field operations, equipment storage, materials, and maintenance activities.
- Installed site water and sewer connections, process piping, valves, supports, tank overflow and drainage systems, plumbing, and associated utility infrastructure.
Concrete Services Division
- Concrete Services Division, LLC performed the concrete forming, placement, finishing, and curing work associated with the Gleneagles Water Tower Construction project.
- Performed concrete work for the foundation and structural components of the new two-million-gallon composite elevated water storage tank.
- Formed and placed the main tank foundation, tank slab, tank derrick slab, and two elevated concrete floors within the tank shaft.
- Constructed concrete foundations and structural elements for the line maintenance building, including footings, frost walls, column footings, columns, slabs, and pipe-support pads.
- Coordinated the placement of approximately 454 cubic yards of concrete throughout the tank, pump-station, and maintenance-building structures.
Electrical Services Division
- Electrical Services Division performed the electrical construction associated with the Gleneagles Water Tower Construction project.
- Furnished and installed the electrical service, distribution equipment, panelboards, surge-protection equipment, conduit, conductors, boxes, devices, and equipment connections required for the new water-tower facility.
- Installed electrical systems serving the two-million-gallon composite elevated water storage tank, office and storage areas, pump station, line maintenance building, site improvements, and associated equipment.
- Installed interior, exterior, site, and tank lighting together with switches, receptacles, controls, branch circuits, and associated wiring.
- Installed extensive underground electrical ductbanks, including excavation, reinforcing steel, concrete encasement, conduit installation, backfilling, and coordination with other underground utilities.