DESIGN-BUILD DIGESTER MIXING EQUIPMENT AND INSTALLATION.
Johnston Construction Company
- Delivered a design-build digester mixing equipment project for the City of Frederick Wastewater Treatment Plant.
- Provided the professional design services, labor, materials and equipment required to implement the City's Digester Mixing Equipment RFP 05-Z.
- Furnished and installed digester mixing equipment as part of a direct agreement between the City of Frederick and Johnston Construction Company.
- Coordinated project design, material submittals and construction activities directly with the City's Project Manager and wastewater treatment plant personnel.
- Performed the work as a turnkey design-build project, with JCC responsible for coordinating the necessary professional services and construction required to complete the contracted improvements.
B & R Electrical Contractors
- Furnished the labor and materials required for the electrical portion of the Frederick Digester Mixing System project.
- Performed electrical work in accordance with the project electrical drawings dated January 24, 2006.
- Installed electrical conduit, wiring and related connections serving the digester mixing system.
- Installed additional PVC-coated conduit inside the existing digester building room as part of the contracted electrical scope.
- Coordinated electrical installation with Johnston Construction Company and the City of Frederick Wastewater Treatment Plant.