DESIGN-BUILD PUMP REPLACEMENT AND SYSTEM IMPROVEMENTS.
Johnston Construction Company
- Johnston Construction Company was selected by American Water Operations and Maintenance, Inc. to complete the design-build rehabilitation and replacement of the Intermediate and Emergency Effluent pumping station pumps at the Fort Meade Wastewater Treatment Plant.
- The project included engineering design, permitting, surveying, construction, final engineered construction drawings, specifications, materials, equipment, labor, startup, training, and closeout for a complete pump replacement project.
- Johnston Construction Company’s scope included replacement of three existing Intermediate and Emergency Effluent pumps with new vertical turbine, open-lineshaft, product-lubricated pumps, along with piping, fittings, electrical coordination, controls, instrumentation, and system integration.
- The work included project planning, site-specific safety planning, verification of existing utilities, coordination with American Water representatives, quality assurance / quality control, engineering field review, site restoration, and preparation of as-built drawings.
- The project required close coordination with American Water’s facility operations, safety procedures, military installation requirements, Davis-Bacon wage requirements, and Fort Meade permitting and access requirements.
Electrical Services Division
- Electrical Services Division, LLC performed electrical work for the Fort Meade WWTP Intermediate & Emergency Effluent Pumping Station Pump Replacements project.
- The project included electrical support for pump replacement work at the Wastewater Treatment Plant Intermediate and Emergency Effluent Pumping Station at Fort Meade, Maryland.
- ESD’s scope included electrical demolition, starter removal from the MCC, HOA switch removal from the MCC, conduit and wire removal from the MCC, local disconnect installation, conduit, wire, connections, temporary control connections, testing coordination, and record drawings.
- Major electrical work included furnishing and installing local disconnects and mounting brackets at the motor locations.
- ESD furnished and installed conduit, wire, and electrical connections required to support the pump replacement work.