Markets Served / Project Experience

Fort Meade Stables Sanitary Lift Station Rehabilitation

Fort George G. Meade, Maryland

LocationFort George G. Meade, Maryland
MarketPump Stations

SANITARY LIFT STATION REHABILITATION, PUMP REPLACEMENT, PROCESS PIPING, CONTROLS, SCADA INTEGRATION, BUILDING IMPROVEMENTS, AND SITE RESTORATION.

Johnston Construction Company

  • Upgraded and rehabilitated the existing Stables Sanitary Lift Station serving the Fort Meade wastewater system.
  • Maintained continuous wastewater service through temporary bypass pumping during construction.
  • Removed existing pumps, valves, piping, control equipment, roofing, entry door, and other obsolete components required for the rehabilitation.
  • Installed two new dry-pit submersible pumps designed for approximately 132 GPM at 15–20 feet TDH.
  • Replaced suction and discharge piping and associated valves within the lift station.

Electrical Services Division

  • Performed the electrical work associated with the Fort Meade Stables Sanitary Lift Station upgrade under Johnston Construction Company's civil subcontract.
  • Disconnected and demolished the existing electrical connections serving Sewage Pumps No. 1 and No. 2.
  • Furnished and installed conduit, wiring, junction boxes, and associated devices for power and control connections to two new 3.7 HP dry-pit Flygt pumps.
  • Core drilled the station floor to route pump cords to the upper level for connection to the new junction box.
  • Furnished cord connectors, cord grips, hardware, and link seals required for the new pump electrical connections.

Browse all project experience