  • Provided engineering, design and construction for rehabilitation of two existing post-aeration and effluent structures at the Fort Meade WWTP.
  • Replaced two surface mechanical aerators and associated electrical power and controls.
  • Rehabilitated structural concrete to correct cracking and spalling.
  • Replaced influent, effluent and bypass gates along with existing isolation valves.
  • Replaced deteriorated steel walkway plates, grating and handrails.