LocationFort Meade / Laurel, Maryland
MarketWastewater Treatment Plants
FINE-SCREEN REHABILITATION, ROTOR-SCREW AUGER REPLACEMENT, SCREEN-TROUGH REPLACEMENT, STAINLESS-STEEL WASH PIPING, ELECTRICAL WORK, HEAT TRACING, INSULATION, TESTING, AND COMMISSIONING.
Johnston Construction Company
- Johnston Construction Company rehabilitated two fine-screen systems serving the Fort George G. Meade Wastewater Treatment Plant.
- JCC removed the existing rotor-screw augers and installed two new augers complete with spiral nylon brushes.
- The company removed and replaced two existing screen troughs with new stainless-steel trough assemblies featuring six-millimeter perforations.
- JCC replaced the existing fine-screen side plates with new stainless-steel side plates.
- The work included new stainless-steel wash-water piping and spray nozzles serving both fine-screen systems.