LocationFort Meade, Maryland
MarketWastewater Treatment Plants
ELECTRICAL DEMOLITION, LOCKOUT, CONDUIT AND WIRING MODIFICATIONS, EQUIPMENT CONNECTIONS, MANUAL MOTOR STARTERS, LED LIGHTING IMPROVEMENTS, CONTROL INTERFACES, INSPECTION, STARTUP, AND AS-BUILT DOCUMENTATION.
Electrical Services Division
- ESD performed electrical lockout and demolition for equipment being replaced within the existing boiler-room facility.
- The project included reuse and extension of existing conduit and wiring to connect replacement mechanical and electrical equipment.
- ESD furnished and installed manual motor starters serving four heat-manifold pumps and three recirculation pumps.
- Six existing light fixtures were replaced and upgraded to LED technology.
- Six additional light fixtures were added to improve illumination and provide a safer working environment within the boiler room.