Ebenezer Church Sewage Pump Station Replacement

Stafford, Stafford County, Virginia

LocationStafford, Stafford County, Virginia
MarketPump Stations

NEW 140 GPM SEWAGE PUMP STATION, WET WELL, FORCE MAIN, PIG LAUNCH, SCADA, STANDBY POWER AND SITE IMPROVEMENTS.

Johnston Construction Company

  • Served as Prime Contractor for construction of a new sewage pumping station for Stafford County.
  • Constructed a complete wastewater pump station designed for an ultimate build-out safe capacity of 140 gallons per minute (GPM).
  • Demolished the existing pump-station wet well and pumps after establishing approved temporary wastewater pumping operations.
  • Constructed and installed a new wet well and packaged sewage pump station.
  • Installed a new pre-fabricated horizontal self-priming centrifugal pump station and associated mechanical systems.

B & R Electrical Contractors

  • Served as the electrical subcontractor to Johnston Construction Company for construction of Stafford County's new Ebenezer Church Sewage Pump Station.
  • Furnished the electrical labor, materials, tools and supervision required for BRE's contracted portion of the new wastewater pumping facility.
  • Performed electrical work in accordance with Division 16 – Electrical of the project specifications and Electrical Drawings E-1 through E-4.
  • Mobilized electrical personnel, tools, equipment and materials necessary to support the project construction schedule.
  • Furnished and installed conduit, conductors and electrical connections for power systems throughout the new sewage pump station.