LocationStafford, Stafford County, Virginia
MarketPump Stations
NEW 140 GPM SEWAGE PUMP STATION, WET WELL, FORCE MAIN, PIG LAUNCH, SCADA, STANDBY POWER AND SITE IMPROVEMENTS.
Johnston Construction Company
- Served as Prime Contractor for construction of a new sewage pumping station for Stafford County.
- Constructed a complete wastewater pump station designed for an ultimate build-out safe capacity of 140 gallons per minute (GPM).
- Demolished the existing pump-station wet well and pumps after establishing approved temporary wastewater pumping operations.
- Constructed and installed a new wet well and packaged sewage pump station.
- Installed a new pre-fabricated horizontal self-priming centrifugal pump station and associated mechanical systems.
B & R Electrical Contractors
- Served as the electrical subcontractor to Johnston Construction Company for construction of Stafford County's new Ebenezer Church Sewage Pump Station.
- Furnished the electrical labor, materials, tools and supervision required for BRE's contracted portion of the new wastewater pumping facility.
- Performed electrical work in accordance with Division 16 – Electrical of the project specifications and Electrical Drawings E-1 through E-4.
- Mobilized electrical personnel, tools, equipment and materials necessary to support the project construction schedule.
- Furnished and installed conduit, conductors and electrical connections for power systems throughout the new sewage pump station.