East Vincent 750,000-Gallon Elevated Water Storage Tank

Spring City, Chester County, Pennsylvania

LocationSpring City, Chester County, Pennsylvania
MarketWater Storage and Tanks

CIVIL, MECHANICAL, ELECTRICAL, AND INSTRUMENTATION WORK FOR NEW 750,000-GALLON SPHEROID ELEVATED WATER STORAGE TANK.

Johnston Construction Company

  • Johnston Construction Company performed subcontract construction work for the East Vincent Elevated Tank Project in Spring City, Pennsylvania.
  • The project included construction and installation of a new 750,000-gallon elevated spheroidal water storage tank with related process, electrical, and site improvements at 11 Dunlap Road.
  • JCC performed its work under subcontract to CB&I Storage Tank Solutions, LLC, which held the prime contract with Pennsylvania American Water for the East Vincent Elevated Tank Project.
  • JCC’s work supported construction of a 750M WSD elevated water storage tank with a 168-foot top capacity level, including site work, foundation work, piping, electrical, instrumentation, temporary roads, erosion and sediment controls, and closeout support.
  • Major work included preliminary site work, excavation, tank foundation construction, underground piping, electrical and instrumentation work, site restoration, erosion and sediment controls, site layout, utility coordination, deadman installation, crane access, temporary roads, and tank foundation conduit coordination.

Concrete Services Division

  • Concrete Services Division, LLC performed concrete construction work for the East Vincent Elevated Tank Project in Spring City, Pennsylvania.
  • The project included construction of a new 750,000-gallon elevated water storage tank for Pennsylvania American Water.
  • CSD performed its work under subcontract to Johnston Construction Company for concrete forming, placement, finishing, curing, and accessory work associated with the tank foundation, tank slab, and tank walls.
  • CSD’s scope included mobilization and demobilization of concrete equipment, form material rental, form lumber purchase, form installation and stripping, concrete placement labor, concrete finishing labor and supplies, concrete curing labor and supplies, and concrete accessory labor.
  • Major concrete work included footing forming, slab-on-grade forming, curved wall forming, straight wall forming, footing placement, slab-on-grade placement, wall placement, float and screed work, trowel finishing, point and patch work, bagging, floor hardener, curing, and concrete accessories.

Electrical Services Division

  • Electrical Services Division performed electrical construction work for the East Vincent Elevated Tank Project in Spring City, Pennsylvania.
  • The project included construction of a new 750,000-gallon elevated water storage tank for Pennsylvania American Water.
  • ESD performed its work under subcontract to Johnston Construction Company for the electrical work associated with the East Vincent 750K Elevated Water Storage Tank.
  • ESD’s scope included conduit, wire, connections, tank lighting, electrical gear, heat tracing coordination, electrical ground rods, ground ring work, electrical excavation, electrical handholes, wire labels, panel labels, conduit labels, future antenna conduits, coordination study, infrared testing, instrumentation wiring, RTU wiring, HVAC wiring, testing, startup, and as-built / record drawings.
  • Major electrical work included AL lighting, AL poles, 4-foot LED fixtures, jelly jar fixtures, wall pack fixture, double-head obstruction light, meter base, 50A ECB, 100A Panel LP-1, two heat tracing lines, direct-bury ductbanks, electrical handhole, and 6-inch conduits for future antenna cables.