LocationDover, Kent County, Delaware
MarketWater Treatment Plants
PRESSURE FILTRATION, SOLIDS HANDLING, HYDRATED LIME, CHEMICAL FEED, PROCESS PIPING, SAND DRYING BEDS, ELECTRICAL AND CONTROLS IMPROVEMENTS.
Johnston Construction Company
- Served as Prime Contractor for a comprehensive process upgrade to the City of Dover's Long Point Water Treatment Plant.
- Managed a multi-discipline construction program incorporating civil, structural, architectural, mechanical, process, electrical, instrumentation and controls improvements.
- Renovated the existing water-treatment facility while integrating new treatment processes and infrastructure.
- Expanded and improved the plant to increase treated-water capacity and enhance the existing treatment process.
- Constructed new treatment facilities supporting the plant's expanded process operations.
Concrete Services Division
- Performed specialized cast-in-place concrete construction supporting a major municipal water treatment plant improvement project.
- Furnished labor, supervision, formwork-related materials, tools and equipment necessary to execute CSD's concrete scope.
- Performed concrete work for the Filter Building.
- Performed concrete work for the Backwash/Residuals Building.
- Performed concrete work associated with the Sand Drying Beds.
B & R Electrical Contractors
- Performed the major electrical construction package for the City of Dover's comprehensive Water Treatment Plant Process Improvements project.
- Furnished electrical labor, materials, tools, equipment and supervision required to complete BRE's subcontracted work.
- Installed power conduit, instrumentation conduit, wiring and electrical connections throughout the upgraded treatment facility.
- Installed electrical infrastructure serving new and renovated water-treatment process equipment.
- Furnished and installed conduit systems appropriate for interior, exterior, underground and process-area conditions.