Defense Distribution Center Susquehanna – New Cumberland WWTP Replacement

New Cumberland, Cumberland County, Pennsylvania

LocationNew Cumberland, Cumberland County, Pennsylvania
MarketWastewater Treatment Plants

FEDERAL WASTEWATER TREATMENT PLANT REPLACEMENT, SBR PROCESS, UV DISINFECTION, PICS CONTROLS & SITE INFRASTRUCTURE.

Johnston Construction Company

  • Johnston Construction Company served as Prime Contractor for the comprehensive replacement of the wastewater treatment plant serving the Defense Distribution Center Susquehanna in New Cumberland, Pennsylvania.
  • Maintained the existing wastewater treatment plant in service until the replacement facilities were operational and certified, requiring carefully sequenced construction, temporary systems and coordinated process cutovers.
  • Demolished major existing treatment facilities, including the influent screening system, Oxigest unit, tertiary filters, chlorine contact tank, Filter Building, Chlorine Building, Control Building and Alum Storage Building.
  • Constructed a new Screening Building and influent screening system, Distribution Chamber, flow-meter vault and associated process infrastructure.
  • Constructed two new Sequencing Batch Reactors (SBRs) and a new aerated sludge holding tank as major components of the replacement biological-treatment process.

Concrete Services Division

  • Concrete Services Division, LLC served as the concrete subcontractor to Johnston Construction Company for the New Cumberland Wastewater Treatment Plant replacement at the Defense Distribution Center Susquehanna.
  • CSD's subcontract encompassed major structural and site-concrete work associated with the replacement wastewater treatment facilities, with the original subcontract pricing schedule totaling approximately 1,291 cubic yards of concrete-related work.
  • Performed concrete forming, placement, finishing and curing for major wastewater-treatment structures including the Control Building, Screening Building, Chemical and Blower Building, Sequencing Batch Reactors, UV Channel, Post-Aeration Tank, Plant Water Vault, Equalization Pump Station pipe supports and Distribution Chamber.
  • Provided forming operations including footing forms, slab-on-grade forms, straight-wall forms, column forms, suspended-slab forms, bulkheads and special forming required for the plant structures.
  • Installed and stripped concrete formwork and performed concrete placement labor for footings, slabs-on-grade, walls, columns and suspended slabs throughout the treatment-plant construction.

B & R Electrical Contractors

  • B & R Electrical Contractors, Inc. performed the major electrical construction package associated with Johnston Construction Company’s replacement of the New Cumberland wastewater treatment plant at the Defense Distribution Center Susquehanna.
  • Furnished the labor, materials, tools and electrical installation required for the new wastewater-treatment facilities under a federal U.S. Army Corps of Engineers project.
  • Installed extensive conduit, power conductors, control wiring and electrical connections serving treatment-process equipment, buildings and supporting infrastructure.
  • Furnished and installed switches, receptacles, panelboards, disconnect switches and electrical distribution equipment throughout the replacement facility.
  • Installed a 500 kVA pad-mounted transformer, together with associated medium- and low-voltage distribution components identified in the electrical subcontract.