LocationYork, York County, Pennsylvania
MarketWastewater Treatment Plants
STAINLESS-STEEL FLOW-DEFLECTION BAFFLES, STRUCTURAL BRACING, ANCHORAGE & CONFINED-SPACE INSTALLATION.
Johnston Construction Company
- Johnston Construction Company served as Prime Contractor for installation of new flow-deflection baffles within the Train 2 wastewater treatment process at the City of York WWTP.
- Furnished and installed four Type 304 stainless-steel baffles at two locations within the Train 2 treatment process.
- JCC installed two sets of baffles designed to help control flow patterns and reduce undesirable back-mixing between treatment stages.
- Installed approximately 34-inch-wide by 80-inch-long stainless-steel baffle assemblies in accordance with the referenced Kruger mechanical installation drawings.
- Furnished and installed eight stainless-steel baffle braces along with associated support brackets, anchors, fasteners, threaded rods, washers, and connection hardware.