LocationLancaster Township, Lancaster County, Pennsylvania
MarketWater Storage and Tanks
CIVIL SITE WORK, TANK FOUNDATION, 24-INCH WATER TRANSMISSION MAIN, PROCESS PIPING, HVAC, ELECTRICAL POWER, LIGHTING, CONTROLS, INSTRUMENTATION, STORMWATER MANAGEMENT, SITE RESTORATION, TESTING, AND STARTUP.
Johnston Construction Company
- Johnston Construction Company performed the civil, mechanical, electrical, and instrumentation work supporting the City of Lancaster’s new three-million-gallon elevated water-storage tank.
- JCC constructed the reinforced-concrete foundation and associated site improvements required for the new elevated tank structure.
- The company performed clearing, grading, erosion and sediment control, stormwater improvements, paving, sidewalks, curbs, fencing, landscaping coordination, and restoration of disturbed areas.
- JCC installed approximately 2,250 linear feet of 24-inch ductile-iron cement-lined water transmission main.
- The transmission-main work included large-diameter tees, bends, a butterfly valve, an air-release-valve manhole, restrained joints, pressure testing, flushing, disinfection, and connection to the City’s existing water-distribution system.
Concrete Services Division
- Concrete Services Division performed the forming, concrete-placement, finishing, curing, and related concrete work supporting the City of Lancaster’s new three-million-gallon elevated water-storage tank.
- CSD constructed concrete elements for the main tank foundation, splash pads, meter-vault sump, and tank vault.
- The company furnished and installed footing, slab-on-grade, curved-wall, straight-wall, column, and supported-slab formwork.
- CSD coordinated placement of approximately 541 cubic yards of concrete across the foundation and associated structures.
- The work included approximately 200.85 cubic yards of footing concrete, approximately 124.67 cubic yards of slab-on-grade concrete, approximately 175.69 cubic yards of wall concrete, approximately 34.88 cubic yards of column concrete, and approximately 4.74 cubic yards of supported-slab concrete.
Electrical Services Division
- Electrical Services Division performed the electrical construction supporting the City of Lancaster’s new three-million-gallon elevated water-storage tank.
- ESD furnished and installed conduit, conductors, electrical connections, boxes, devices, switches, receptacles, and lighting throughout the elevated-tank facility.
- The company furnished and installed the new electrical service, Panelboard P, metering equipment, disconnects, and surge-protection equipment.
- ESD installed a comprehensive interior and exterior lighting system consisting of multiple fixture types serving the tank pedestal, operating spaces, access areas, and exterior site.
- The electrical scope included four site-lighting poles with concrete foundations that also provided mounting locations for security cameras furnished by others.