  • Johnston Construction Company completed the Central Correctional Facility Collection System Upgrade for Maryland Environmental Service.
  • The project replaced an outdated sewage pumping station with a new gravity-sewer collection system serving the correctional facility.
  • JCC installed approximately 1,400 linear feet of new 12-inch PVC sanitary sewer main.
  • The new gravity sewer was connected to the existing County sewer system through a roadway crossing.
  • The work included five standard sanitary manholes, one internal-drop manhole, and one doghouse manhole.