LocationSykesville, Carroll County, Maryland
MarketWastewater Treatment Plants
GRAVITY SEWER INSTALLATION, 12-INCH PVC SANITARY SEWER MAIN, STANDARD AND DROP MANHOLES, EXISTING PUMP-STATION MODIFICATIONS, ROAD CROSSING, SECURITY FENCING, TRAFFIC MANAGEMENT, EROSION CONTROLS, TESTING, CLOSEOUT, AND SITE RESTORATION.
Johnston Construction Company
- Johnston Construction Company completed the Central Correctional Facility Collection System Upgrade for Maryland Environmental Service.
- The project replaced an outdated sewage pumping station with a new gravity-sewer collection system serving the correctional facility.
- JCC installed approximately 1,400 linear feet of new 12-inch PVC sanitary sewer main.
- The new gravity sewer was connected to the existing County sewer system through a roadway crossing.
- The work included five standard sanitary manholes, one internal-drop manhole, and one doghouse manhole.