LocationFelton, Kent County, Delaware
MarketWater Storage and Tanks
CONSTRUCTION SUPPORT FOR NEW 500,000-GALLON PEDESTAL SPHEROID ELEVATED WATER STORAGE TANK INCLUDING SITE WORK, FOUNDATION SUPPORT, WATER MAIN, OVERFLOW PIPING, STORM DRAINAGE, ELECTRICAL COORDINATION, TESTING, AND CLOSEOUT.
Johnston Construction Company
- Johnston Construction Company performed construction work for the Carpenters Bridge Crossing Elevated Storage Tank project in Felton, Delaware.
- The project included construction of a new 500,000-gallon pedestal spheroid elevated water storage tank for Tidewater Utilities, Inc. in Kent County, Delaware.
- JCC performed its work under subcontract to CB&I Storage Tank Solutions, LLC, which held the prime contract with Tidewater Utilities, Inc. for the Elevated Water Storage Tank project.
- JCC’s scope supported construction of the 500M WSD / 154-foot top capacity level elevated water storage tank, including site work, foundation support, piping, utility work, electrical coordination, testing, documentation, and related construction support.
- Major work included tank pile foundation support, reinforced concrete pile cap, ring wall, grout ring, floor slab, test piles, reaction piles, pile load testing, site work, water mains, overflow piping, splash pad, storm drainage piping, site entrance, gravel work area, site grading, sediment and erosion control, and related tank facility work.
Concrete Services Division
- Concrete Services Division, LLC performed concrete construction work for the Carpenters Bridge Crossing Elevated Storage Tank project in Felton, Delaware.
- The project included construction of a new 500,000-gallon elevated water storage tank for Tidewater Utilities, Inc. at Carpenters Bridge Crossing.
- CSD performed its work under subcontract to Johnston Construction Company for concrete forming, placement, finishing, curing, and accessory work associated with the tank foundation, tank slab, and tank walls.
- CSD’s scope included concrete equipment mobilization and demobilization, form material rental, form lumber purchase, installation and stripping of forms, concrete placement labor, concrete finishing labor and supplies, concrete curing labor and supplies, and concrete accessory labor.
- Major concrete work included forming slab-on-grade, forming curved walls, forming straight walls, placing slab-on-grade concrete, placing wall concrete, float and screed work, trowel finishing, point and patch work, bagging, curing, mesh, dowels, pipe pads, and related concrete accessories.
Electrical Services Division
- Electrical Services Division performed electrical construction work for the Carpenters Bridge Crossing Elevated Storage Tank project in Felton, Delaware.
- The project included construction of a new 500,000-gallon elevated water storage tank for Tidewater Utilities, Inc. at Carpenters Bridge Crossing.
- ESD performed its work under subcontract to Johnston Construction Company for the electrical work associated with the Carpenters Bridge Crossing 500K Elevated Water Storage Tank.
- ESD’s scope included conduit, wire, connections, tank lighting, gear, electrical ground rods, ground ring work, electrical excavation, wire labels, panel labels, conduit labels, future antenna conduits, heat tracing, coordination study, infrared testing, instrumentation wiring, RTU wiring, HVAC equipment wiring, as-built drawings, testing, startup, and closeout support.
- Major electrical work included Type A, Type B, Type C, emergency, and obstruction lighting; meter base; 100A Panel LP-1; service disconnect; ground rods connected to the base of the tank in four locations; ground ring connection; direct burial excavation for the ground ring and gate operator; and 6-inch conduits for future antenna cables.