Camp Fretterd Water Booster Station Improvements

Reisterstown, Baltimore County, Maryland

LocationReisterstown, Baltimore County, Maryland
MarketPump Stations

NEW PREFABRICATED WATER BOOSTER STATION, WATER DISTRIBUTION PIPING, CONCRETE FOUNDATION, ELECTRICAL SYSTEMS, CONTROLS, EXISTING BOOSTER STATION REMOVAL, AND SITE RESTORATION.

Johnston Construction Company

  • Johnston Construction Company completed the Camp Fretterd Water Booster Station Improvements project for Maryland Environmental Service.
  • The project included construction of a new prefabricated water booster station to increase pumping capacity and maintain residual water pressure throughout the Camp Fretterd water distribution system.
  • JCC’s scope included project coordination, site preparation, reinforced-concrete foundation construction, prefabricated station installation, underground water piping, electrical service, control systems, startup, and site restoration.
  • The new station included three domestic-water pumps and one high-flow pump, along with process piping, valves, instrumentation, automatic controls, lighting, heating, ventilation, and electrical equipment.
  • The work included modifications to the existing potable-water distribution system and installation of new underground piping, valves, fittings, restraints, and appurtenances.

Concrete Services Division

  • Concrete Services Division, LLC completed the concrete forming, placement, finishing, curing, and accessory work associated with the Camp Fretterd Water Booster Station Improvements project.
  • The work included footing formwork, slab-on-grade formwork, special formwork, slab concrete placement, special concrete placement, floating, screeding, pointing, patching, curing, vapor-barrier installation, sawcut joints, and joint sealing.
  • CSD installed approximately 278 square feet of footing forms, 64 square feet of slab-on-grade forms, and 252 square feet of special formwork.
  • CSD placed approximately 18 cubic yards of slab-on-grade concrete and 8 cubic yards of special concrete.
  • The concrete work included approximately 277 square feet of floated and screeded surfaces, 252 square feet of pointing and patching, and 871 square feet of concrete curing.

B & R Electrical Contractors

  • B & R Electrical Contractors, Inc. completed the electrical work associated with the Camp Fretterd Water Booster Station Improvements project.
  • The project included electrical demolition, conduit, wiring, connections, underground ductbank construction, inspection, testing, and startup services.
  • BRE relocated the existing autodialer and antenna and completed the conduit, wiring, and signal connections required for continued alarm communication.
  • The work included direct-buried PVC conduit and underground ductbank construction, including conduit routed across the generator slab in accordance with the project drawings.
  • BRE reconnected the applicable circuits associated with the existing generator and automatic transfer switch serving the improved booster-station facilities.