LocationReisterstown, Baltimore County, Maryland
MarketPump Stations
NEW PREFABRICATED WATER BOOSTER STATION, WATER DISTRIBUTION PIPING, CONCRETE FOUNDATION, ELECTRICAL SYSTEMS, CONTROLS, EXISTING BOOSTER STATION REMOVAL, AND SITE RESTORATION.
Johnston Construction Company
- Johnston Construction Company completed the Camp Fretterd Water Booster Station Improvements project for Maryland Environmental Service.
- The project included construction of a new prefabricated water booster station to increase pumping capacity and maintain residual water pressure throughout the Camp Fretterd water distribution system.
- JCC’s scope included project coordination, site preparation, reinforced-concrete foundation construction, prefabricated station installation, underground water piping, electrical service, control systems, startup, and site restoration.
- The new station included three domestic-water pumps and one high-flow pump, along with process piping, valves, instrumentation, automatic controls, lighting, heating, ventilation, and electrical equipment.
- The work included modifications to the existing potable-water distribution system and installation of new underground piping, valves, fittings, restraints, and appurtenances.
Concrete Services Division
- Concrete Services Division, LLC completed the concrete forming, placement, finishing, curing, and accessory work associated with the Camp Fretterd Water Booster Station Improvements project.
- The work included footing formwork, slab-on-grade formwork, special formwork, slab concrete placement, special concrete placement, floating, screeding, pointing, patching, curing, vapor-barrier installation, sawcut joints, and joint sealing.
- CSD installed approximately 278 square feet of footing forms, 64 square feet of slab-on-grade forms, and 252 square feet of special formwork.
- CSD placed approximately 18 cubic yards of slab-on-grade concrete and 8 cubic yards of special concrete.
- The concrete work included approximately 277 square feet of floated and screeded surfaces, 252 square feet of pointing and patching, and 871 square feet of concrete curing.
B & R Electrical Contractors
- B & R Electrical Contractors, Inc. completed the electrical work associated with the Camp Fretterd Water Booster Station Improvements project.
- The project included electrical demolition, conduit, wiring, connections, underground ductbank construction, inspection, testing, and startup services.
- BRE relocated the existing autodialer and antenna and completed the conduit, wiring, and signal connections required for continued alarm communication.
- The work included direct-buried PVC conduit and underground ductbank construction, including conduit routed across the generator slab in accordance with the project drawings.
- BRE reconnected the applicable circuits associated with the existing generator and automatic transfer switch serving the improved booster-station facilities.