LocationFrederick, Frederick County, Maryland
MarketWater Storage and Tanks
TANK FOUNDATION, CIVIL AND SITEWORK, MECHANICAL PIPING AND VALVES, ALTITUDE VALVE, ELECTRICAL, INSTRUMENTATION AND CONTROLS, EROSION AND SEDIMENT CONTROLS, STORMWATER MANAGEMENT, WATER MAIN, SANITARY AND STORM SEWER.
Johnston Construction Company
- Johnston Construction Company performed a major civil, structural, mechanical, electrical, instrumentation, and sitework subcontract supporting construction of the Butterfly Lane Water Storage Tank.
- JCC supported construction of a new one-million-gallon composite elevated water-storage tank for the City of Frederick.
- The company performed mobilization, site preparation, erosion and sediment control, clearing, grading, excavation, backfill, and restoration required for the new tank facility.
- JCC completed the excavation and supporting civil work associated with the specialized composite-tank foundation.
- The company coordinated foundation construction with Caldwell Tanks’ design, reinforcement, anchor-bolt, pedestal, and tank-erection requirements.
Concrete Services Division
- Concrete Services Division performed the concrete-forming, placement, finishing, and curing work supporting construction of the Butterfly Lane Water Storage Tank.
- CSD furnished the labor, form materials, form lumber, tools, concrete-finishing supplies, curing supplies, and supervision required for its assigned work.
- The company performed concrete work supporting the new one-million-gallon composite elevated water-storage tank constructed for the City of Frederick.
- CSD formed and placed the reinforced-concrete tank foundation, including the footing and curved-wall portions of the specialized composite-tank structure.
- The company formed and placed the interior floor slab within the base of the elevated-tank support pedestal.
Electrical Services Division
- Electrical Services Division performed the electrical work supporting construction of the new one-million-gallon Butterfly Lane Water Storage Tank.
- ESD furnished the labor, electrical materials, tools, equipment, supervision, mobilization, and field services required for its assigned work.
- The company installed electrical service and distribution equipment serving the elevated water-storage tank and associated operating systems.
- ESD furnished and installed panelboards, disconnect switches, motor-starting equipment, circuit breakers, transformers, contactors, and related electrical components.
- The company installed electrical raceways, conductors, boxes, devices, fittings, supports, and wiring serving the tank’s electrical and mechanical systems.