LocationJessup, Anne Arundel County, Maryland
MarketPump Stations
LIFT-STATION INSTALLATION, WET WELL, VALVE VAULT, FORCE-MAIN PIPING, SITE UTILITIES, STRUCTURAL CONCRETE, MECHANICAL SYSTEMS, ELECTRICAL POWER, EMERGENCY GENERATOR, CONTROLS, INSTRUMENTATION, ODOR CONTROL, TESTING, AND SITE RESTORATION.
Johnston Construction Company
- Johnston Construction Company performed the comprehensive installation of the Brock Bridge Landing sewage pumping station and its associated force-main, mechanical, electrical, instrumentation, and site systems.
- JCC constructed the new 45-gallon-per-minute submersible grinder-pump station, including the wet well, valve vault, associated structures, piping, valves, and operational appurtenances.
- The work included excavation, dewatering, structural preparation, precast structure installation, backfill, compaction, grading, concrete work, and restoration of disturbed areas.
- JCC installed the limited sanitary-sewer and force-main piping included in its subcontract, together with valves, fittings, restraints, utility structures, and required connections.
- The company installed the pumping-station mechanical systems, including interior piping, pipe supports, ventilation components, equipment access systems, and the assigned odor-control infrastructure.
B & R Electrical Contractors
- B & R Electrical Contractors performed the electrical construction supporting the new Brock Bridge Landing Sewage Pumping Station.
- BRE installed electrical raceways, conductors, boxes, equipment connections, lighting, grounding, controls, and power-distribution infrastructure throughout the pumping-station facility.
- The electrical work supported two submersible grinder pumps, the pump-control system, wet-well instrumentation, ventilation equipment, odor-control equipment, and associated mechanical systems.
- BRE installed or connected the electrical service, panelboards, disconnecting equipment, surge protection, automatic transfer equipment, and emergency-power infrastructure.
- The company provided electrical connections and controls supporting the emergency generator and automatic transfer of the pumping station from normal utility power to standby power.