CIVIL, MECHANICAL, ELECTRICAL, AND INSTRUMENTATION WORK FOR NEW 1,000,000-GALLON ELEVATED WATER STORAGE TANK.

Johnston Construction Company

  • Johnston Construction Company performed subcontract construction work for the Bear-Corbitt Road Elevated Water Storage Tank project in New Castle, Delaware.
  • The project included design and construction of a new 1,000,000-gallon elevated water storage tank for Veolia Water Delaware.
  • JCC performed its work under subcontract to CB&I Storage Tank Solutions, LLC, which held the prime contract with Veolia for completion of the elevated water storage tank project.
  • JCC’s work supported construction of the elevated water storage tank through site work, tank foundation work, piping, conduit, electrical coordination, instrumentation coordination, site restoration, and related construction support.
  • Major work included mobilization, permits, erosion and sediment controls, tank foundation work, piping and conduit, electrical tank coordination, site grading, seeding, gravel access drive construction, tank slab floor drain piping, and project closeout support.

Concrete Services Division

  • Concrete Services Division, LLC performed concrete construction work for the Bear-Corbitt Road Elevated Water Storage Tank project in New Castle, Delaware.
  • The project included design and construction of a new 1,000,000-gallon elevated water storage tank for Veolia Water Delaware.
  • CSD performed its work under subcontract to Johnston Construction Company for forming, placement, finishing, curing, and concrete accessory work associated with the tank foundation.
  • CSD’s scope included mobilization and demobilization of concrete equipment, rental of form material, purchase of form lumber, installation and stripping of forms, concrete placement labor, concrete finishing labor and supplies, concrete curing labor and supplies, and concrete accessory labor.
  • Major concrete work included footing forming, slab-on-grade forming, curved wall forming, footing placement, slab-on-grade placement, wall placement, float and screed work, trowel finishing, point and patch work, bagging, curing, and concrete accessories.

Electrical Services Division

  • Electrical Services Division, LLC performed electrical construction work for the Bear-Corbitt Road Elevated Water Storage Tank project in New Castle, Delaware.
  • The project included design and construction of a new 1,000,000-gallon elevated water storage tank for Veolia Water Delaware.
  • ESD performed its work under subcontract to Johnston Construction Company for electrical work associated with the Bear-Corbitt Road Elevated Water Storage Tank project.
  • ESD’s scope included furnishing and installing conduit, wire, connections, lights, switches, receptacles, a NEMA 12 panelboard, tank lighting, tank grounding, and heat tracing of the riser pipe above the condensate ceiling.
  • Major electrical work included one wall pack, twelve jelly jar fixtures, four 4-foot fixtures, one emergency fixture, four ground rods connected to the base of the tank, three 2-inch conduits stubbed out of the tank foundation, mixer electrical connection, and a 30A NEMA 4X disconnect.

Additional project details

  • JCC supported construction of a new 1,000,000-gallon welded-steel elevated water storage tank for Veolia Water Delaware.
  • Its civil, mechanical, electrical, and instrumentation package covered site preparation, tank foundations, utility connections, and restoration.