Aberdeen Advanced Wastewater Treatment Plant Digester Gas Flare Improvements

Aberdeen, Harford County, Maryland

LocationAberdeen, Harford County, Maryland
MarketWastewater Treatment Plants

DIGESTER CLEANING, SLUDGE REMOVAL, DIGESTER GAS PIPING, CONDENSATE REMOVAL, SAFETY EQUIPMENT, WASTE GAS FLARE, PRECAST CHAMBERS, ACCESS-ROOM MODIFICATIONS, HVAC, ELECTRICAL, CONTROLS, AND SITE RESTORATION.

Johnston Construction Company

  • Johnston Construction Company completed the Aberdeen Advanced Wastewater Treatment Plant Digester Gas Flare Improvements project for the City of Aberdeen.
  • The project included demolition of the existing digester gas piping and safety equipment and installation of a new digester gas collection, condensate-removal, safety, control, and waste gas flare system.
  • JCC cleaned, dewatered, and removed accumulated sludge, grit, grease, scum, and other materials from Digester Nos. 1 and 2 while maintaining continued operation of the plant’s anaerobic digestion process.
  • The work was carefully sequenced so that only one digester was removed from service at a time, allowing the remaining digester to continue supporting wastewater-treatment operations.
  • JCC furnished and installed a Varec Biogas waste gas burner system, condensate and sediment traps, electrically actuated drip traps, pressure regulation, flame-protection equipment, instrumentation, and automatic controls.

B & R Electrical Contractors

  • B & R Electrical Contractors completed the electrical work associated with the Aberdeen Advanced Wastewater Treatment Plant Digester Gas Flare Improvements project.
  • BRE’s scope included electrical demolition, conduit, wiring, boxes, devices, switchgear, heat tracing, instrumentation connections, underground ductbank work, inspection, testing, startup, and project closeout.
  • The work included eight explosion-proof light fixtures, two explosion-proof disconnects, three motor-control-center buckets, Lighting Panel LP-1, a 30 kVA transformer, and multiple explosion-proof control switches.
  • BRE installed heat tracing for Digester Nos. 1 and 2 and for the digester gas flare piping located within the vault.
  • Electrical work was coordinated with the new waste gas flare, condensate-removal equipment, gas-safety systems, mechanical piping, precast chambers, HVAC systems, and active wastewater-treatment operations.